[Currently I have a Mag 12 running on a closed loop with a SCWD with all 3/4" PVC. The outputs are loclines with "fan" ends.
I use this to create flow behind the rocks and it seems to work pretty well but I know the flow is like 1/2 what it could be.
So I have a couple options.
1) Keep waiting for the 1" SCWD to come out and leave what I have for now.
2) Don't wait, use existing SCWD with 1 1/2" piping everywhere (does it matter that the locline is 3/4"?)
3) Wait for Christmas money and get an oceans motions Squirt and totally redo my closed loop with 4 outputs.
Rank them for me!]
Edited By kwl1763 on 1101244796
I use this to create flow behind the rocks and it seems to work pretty well but I know the flow is like 1/2 what it could be.
So I have a couple options.
1) Keep waiting for the 1" SCWD to come out and leave what I have for now.
2) Don't wait, use existing SCWD with 1 1/2" piping everywhere (does it matter that the locline is 3/4"?)
3) Wait for Christmas money and get an oceans motions Squirt and totally redo my closed loop with 4 outputs.
Rank them for me!]
Edited By kwl1763 on 1101244796