So there was a couple issues I had. The tank is going to be roughly 800G total so I needed at least 3 phosban reactors going. Since the flow is so slow for them I figured I could daisy chain a bunch together. That however would cause an issue since the first reactor media would be used up fastest, etc so I had to figure a way to run them in parallel. It would have been easy enough to get a bunch of 1/2" soft piping and 1/2" T's and done it that way but the major problem was the sides of my sump are to wide for the reactor hanger. I had to do more then widen thaough as they need to be fairly level to work properly. So a few Lowe's trips and an afternoon later here is what I came up with!
alt="">
The ball valves are strictly to keep water from circulating through the support parts. Here are some other angles.
alt="">
alt="">
alt="">
The ball valves are strictly to keep water from circulating through the support parts. Here are some other angles.