Not doing bad.
Tank started seeping on side seam had to move into smaller tank.
Decided to drill and install bulkheads since the tank is down for repairs.
Got a decent overflow, 1 inch bulkheads and hole saw on E-bay at good price.
Silicone is drying now. Then drill holes, do plumbing and start to cycle.