I have all the fittings for the Durso stand pipe for my 75g.
My question is: Where do I position the downspout "T" inside the overflow box?
Near the top, in the middle, or at the bottom closest to the bulkhead.
I am assuming that the cap with the air hole should be above the water level.
My question is: Where do I position the downspout "T" inside the overflow box?
Near the top, in the middle, or at the bottom closest to the bulkhead.
I am assuming that the cap with the air hole should be above the water level.