well i set up the 300 this weekend and i elected to go ahead and use the closed loop set up that was drilled in the bottom of the tank. There was a 1.5 drain and 1.5 return bulk head and what i did was run the drain via 1.5 inch plumbing to a 1 inch reducer to the iwaki xrlt40 pump and go back to the tank via a 1 inch reducer to a 1.5 inch pipe to the 1.5 inch bulkhead at the bottom of the tank. From the tank i went with a 1 inch pipe with a tee and made a bar that comes from the left side of the tank to the right. so from the left i have a linelock that is covered in the rock and in the middle i tee'd off and made a small spray bar running between the two overflows and on the right i used a line lock hidden in the rock. The pump is rated at 1200 gallons per hour and i do like the flow of it, but my question is.
Other than heat and having pumps in the tank, what are the advantages. It seems as if the iwaki pumps are running about 130ish watts and i can get the same random flow with a koralia 4 (1200 gph)? It seem seems that the postion is the only advantage that i can think of. I am debating on not using it since i will have two tunze 6100s on a multi controller. Seems like a waste of energy to me.
Please offer suggestions and comments. I would agree to anyone in advance that the planning and layout of the two holes is less than favorable, but i had to work with what i had.
Her is a simple version of what i had (crude drawing)
xxx = overflow
o = hole for the return
O = 3/4 line lock hidden in rock
+ = tee used to come off main line to create spraybar
- = 1inch pvc
________________________________
l XXX o --+--- XXX l
l l l l
l O
<hr class="bbcode_rule" />
l
<hr class="bbcode_rule" />
+
<hr class="bbcode_rule" />
O l
l__________________________
Other than heat and having pumps in the tank, what are the advantages. It seems as if the iwaki pumps are running about 130ish watts and i can get the same random flow with a koralia 4 (1200 gph)? It seem seems that the postion is the only advantage that i can think of. I am debating on not using it since i will have two tunze 6100s on a multi controller. Seems like a waste of energy to me.
Please offer suggestions and comments. I would agree to anyone in advance that the planning and layout of the two holes is less than favorable, but i had to work with what i had.
Her is a simple version of what i had (crude drawing)
xxx = overflow
o = hole for the return
O = 3/4 line lock hidden in rock
+ = tee used to come off main line to create spraybar
- = 1inch pvc
________________________________
l XXX o --+--- XXX l
l l l l
l O
<hr class="bbcode_rule" />
l
<hr class="bbcode_rule" />
+
<hr class="bbcode_rule" />
O l
l__________________________