In the next couple weeks I am getting in a 210g water storage container (37" Diameter, 72" Height) that I will be using for mixing saltwater. I will probably keep the water volume below the 3/4 mark rather than all the way up. The bulkhead is at the bottom so I was thinking of drilling and adding a 2nd bulkhead at the top so I can circulate the water from bottom to top to maximize water turnover when mixing. I will have a separate bulk-head added at the bottom and separate pump to transfer water as needed to my sump (part of my automated system).
Other than with the 2nd bulkhead at the base, i am basically mimicking what Marc documented on reef addicts for plumbing:
http://reefaddicts.com/content.php/283-Plumbing-Primer-how-to-do-it-correctly/view/3
My first question is what GPH would be optimum for mixing and then continuously circulating mixed saltwater? Marc uses 800gph in his. Would seem like a reasonable gph, but worth bringing up the topic. I would assume that with 6 feet of head pressure it would be reduced down to at least 500gph in the end.
And regarding the 2nd pump that will transfer water to my tank, the reason I am doing this instead of what Marc does with using a ball valve is because it is part of an automated water change system, so I want the outlet (using an Apex) to determine when the water transfers rather than a manual mechanism. My concern is that if the pump is on the ground and the piping is on the ground all the way to my sump that the water pressure from the height of the water in the container will force continuous water through the pump and piping. And a check valve wouldn't suffice here since the water is going the same direction as where the risk is. If I were to run my piping up from the pump (on the ground) to above the water container height (say 7 feet up) and then run it back down and to the sump, will this kill the water pressure's chance of causing a continuous flow?
Other than with the 2nd bulkhead at the base, i am basically mimicking what Marc documented on reef addicts for plumbing:
http://reefaddicts.com/content.php/283-Plumbing-Primer-how-to-do-it-correctly/view/3
My first question is what GPH would be optimum for mixing and then continuously circulating mixed saltwater? Marc uses 800gph in his. Would seem like a reasonable gph, but worth bringing up the topic. I would assume that with 6 feet of head pressure it would be reduced down to at least 500gph in the end.
And regarding the 2nd pump that will transfer water to my tank, the reason I am doing this instead of what Marc does with using a ball valve is because it is part of an automated water change system, so I want the outlet (using an Apex) to determine when the water transfers rather than a manual mechanism. My concern is that if the pump is on the ground and the piping is on the ground all the way to my sump that the water pressure from the height of the water in the container will force continuous water through the pump and piping. And a check valve wouldn't suffice here since the water is going the same direction as where the risk is. If I were to run my piping up from the pump (on the ground) to above the water container height (say 7 feet up) and then run it back down and to the sump, will this kill the water pressure's chance of causing a continuous flow?