Could I plumb two phosban reactors together with one pump to eliminate the need for extra tubing and 2 pumps? I was thinking of putting the pump on the first reactor, which would contain the activated carbon, which would in turn feed into the second reactor utilizing GFO. My only concern is having too little flow to make it through both reactors failing to be able to control the flow enough from the carbon reactor to the GFO reactor so that the GFO would be pulverized. Any ideas?